| ENGINEERING SERVICES |
|
Large Hydro Power Projects |
| 1 |
Run-of-the-river Hydro Electric Project of proposed capacity 320 MW (8 x 40 MW) across river Godavari at Dummugudem, Khammam District, Telangana State |
| 2 |
Run -of-the-river Hydro Electric Project of proposed capacity 280 MW (7 x 40 MW) across river Godavari at Kanthanapally, Warangal District, Telangana State |
| 3 |
Sitamma Sagar Multi-purpose Project 282.8 MW, Bhadradi-Kothagudem District, Telangana |
| 4 |
Self Identified Pump Storage Project (PSP) of 500 MW in Telangana |
|
Small Hydro Power Projects |
| 5 |
Gonal small hydel scheme III, 2 x 2.5 MW on Devapur nala, tributary to Krishna River |
| 6 |
Nandikere small hydel scheme, 5 x4.90 MW on left bank of Cauvery river |
| 7 |
Lower Sileru Forebay reservoir Small Hydel Scheme, 3 x 1.334 MW |
| 8 |
Upper Sileru Forebay reservoir mini hydel scheme, 3 x 1.75 MW (near intake regulator of guntawada reservoir) |
| 9 |
Mini hydro electric project, 2x0.70 MW on Nagavali river (4.5 Kms. downstream of Thotapalli barrage) |
| 10 |
Small hydel power scheme, 2 x 1.75 MW on Swarnmukhi River |
| 11 |
Small hydel power scheme, 2 x 1.40 MW on Eddu Vagu (3.6km from Kattamuru bridge) |
| 12 |
Proposed Small hydel power scheme, 2 x 1.50 MW on Akkampally balancing reservoir |
| 13 |
Preparation of design and drawings for Civil structures and Power house works for hydro power projects - Pinjarikonda HEP - 1.20 MW |
| 14 |
Preparation of design and drawings for Civil structures and Power house works for hydro power projects - Mitlapalem HEP - 1.20 MW |
|
| Geospatial Survey |
| 1 |
Run-of-the-river Hydro Electric Project of proposed capacity 320 MW (8 x 40 MW) across river Godavari at Dummugudem, Khammam District, Telangana State |
| 2 |
Run -of-the-river Hydro Electric Project of proposed capacity 280 MW (7 x 40 MW) across river Godavari at Kanthanapally, Warangal District, Telangana State |
| 3 |
Sitamma Sagar Multi-purpose Project, Bhadradi-Kothagudem District, Telangana |
|
| PROJECT MANAGEMENT CONSULTANCY |
| 1 |
Gonal small hydel scheme III, 2 x 2.5 MW on Devapur nala, tributary to Krishna River |
| 2 |
Nandikere small hydel scheme, 5 x4.90 MW on left bank of Cauvery river |
| 3 |
Lower Sileru Forebay reservoir Small Hydel Scheme, 3 x 1.334 MW |
| 4 |
Upper Sileru Forebay reservoir mini hydel scheme, 3 x 1.75 MW (near intake regulator of guntawada reservoir) |
|
| VALUE ENGINEERING |
| 1 |
Power Augmentation of Lower Jurala Hydro Electric Project, Mahbubnagar District, Telangana |
| 2 |
Coffer Dam for Saftey of Lower Jurala Hydro Electric Project, Mahbubnagar District, Telangana |
| 3 |
Srisailam Tailpond Dam, Right Side NOF, Krishna River (downstream of Srisailam dam), Telangana |
| 4 |
Detailed Design review & value Engineering Services EPC Execution of Daudhan Dam under Ken Betwa Link Project, Madhya Pradesh |